Installation, commissioning and acceptance plan for vertical BMC injection molding machine

source:   time:2023-10-21   Click:388

Installation, commissioning and acceptance plan for vertical BMC injection molding machine

Based on the professionalism and rigor of the plan, we have introduced in detail the precautions for the entire installation and debugging process.

 The duty of The new machine installnation

1.Strictly abide by the company's various management systems and obey the work arrangements of department leaders.

2.Cooperate with customers during machine installation and debugging.

3.Staff members need to understand the general use of the machine, strictly abide by the machine debugging operating procedures, and prepare relevant            debugging and training customer employee plans to ensure that the machine is completed as scheduled.

     4.The staff assists customers in machine acceptance, staff training and collection of original data on machine use.

     5.Transfer relevant file information and file.



The acceptance plan is detailed and scientific, with clear stages and clear implementation standards (preferably presented in a table).

The company will have a formal acceptance form, and the customer will accept the goods based on the acceptance form.

The details of the acceptance form are as follows:

(1)Equipment name, equipment model, quantity/unit, production date, equipment number

(2)Equipment acceptance status of vertical BMC injection molding machine


       1.Are the equipment and accessories complete?

       2. Is the device powered on normally?

       3. Does the equipment operate normally after installation?

       4. Do you agree that the equipment will pass on-site acceptance?

       5. Are everything in place according to the contract?

       6. Have all the equipment been debugged?

       7. Date of acceptance:  year,  month,  day

Machine inspection personnel:

Acceptance conclusion:

Both parties signing and sealing the equipment inspection.

Popular tags:Vertical BMC injection molding machine
CONTACT THE TAIFU

Contact: Hanna WANG

Mobile phone:+86 13650147429

Fax:0769-81929375

email:waimao005@dg-taifu.com

Address: Fulong Yangwu Industrial Area, Shipai Town, Dongguan City, Guangdong Provice, China

Copyrights©2018 Dongguan Tai Fu Machinery Co., Ltd. All Rights Reserved case number:粤ICP备16078114号